Skip to content

Sample Rotary Phase Converter, Heavy Duty, Single Phase to 3 Phase (SAMPLE-R2)

$2,100.00

Sample listing. Not for sale yet.

Horsepower

Notify me when back in stock

Listing status: Listed control panel, stated in the maker's words (sample)

Not sure of the size?

See each maker's published sizing rule applied to your machine, with the math, in the sizing calculator.

Or call (855) 923-2610.

This unit ships by LTL freight on a pallet. The checklist above shows what to check when it arrives.

Sample listing. This page shows the layout a real product gets. It is not a real product and cannot be bought. Prices are placeholders.

A heavy duty rotary phase converter. On the maker's own table, the 10 hp size carries 10 hp of total running load and starts one motor up to 5 hp (sample figures). Single phase 240V in, 3 phase 240V out.

What size do you need?

A real listing shows the maker's own sizing rule here, with the math for common machines. Sample figures:

  • 5 hp lathe, on a 2x rule: 5 x 2 = 10. The 10 hp size fits.
  • 5 hp piston compressor, on a 2.5x rule: 5 x 2.5 = 12.5. The rule points to the 15 hp size.

Check yours with the phase converter sizing calculator, or call (855) 923-2610.

Specifications

Maker Sample maker
Model SAMPLE-R2
Line Heavy Duty (sample)
Horsepower sizes 5, 7.5, 10, 15 and 20 hp (sample)
Largest starting motor Half the size's hp, on the maker's own table (sample)
Input 240V single phase (sample)
Output 240V 3 phase (sample)
Full load input amps 26 A at 240V for the 5 hp size (sample)
What's included TEFC idler motor with heavy duty bearings on a steel skid, and a control panel with start and stop pushbuttons (sample)
Enclosure Steel, indoor, heavy gauge (sample)
Ship method One shipment by freight, motor and panel on one skid (sample)

Listing status

A real listing quotes the maker's exact listing words for this model. Sample: "Listed control panel." Ask your local inspector what he requires before you order.

Warranty

A real listing quotes the maker's warranty terms, part by part. Sample: 2 years on the control panel and the idler motor.

Who installs it

A licensed electrician. The maker's installation manual covers the connections. Your electrician will want it.

What arrives

The unit comes on a skid by truck. Inspect it before you sign. See shipping and returns.